Understanding Electrical Systems

Explore top LinkedIn content from expert professionals.

  • View profile for Malik N.

    Technical Leader – Solar & BESS | Utility-Scale Renewable Integration | Grid Code & PPA Structuring Expert Helping CEOs & Investors De-Risk Renewable Assets

    17,759 followers

    Grid-Forming Inverters: Quietly Solving a Crisis We Don’t Talk About As renewables scale, one thing is quietly disappearing from our grids: Inertia. Spinning turbines in coal, gas, and hydro plants used to stabilize frequency. But inverter-based solar and storage don’t provide that naturally. Enter Grid-Forming Inverters (GFIs), not just feeding power, but actively supporting the grid. ✅ Create voltage and frequency reference — no need to follow others ✅ Provide virtual inertia for smoother post-fault recovery ✅ Enable black start capability (restart a dead grid) ✅ Stabilize weak grids — vital for remote and developing regions In short: they help solar + BESS act like conventional generation and that changes everything. 📊 A few numbers to keep in mind: • Australia targets 80% of new inverters to be grid-forming by 2035 • Systems with over 60% inverter-based generation become unstable without GFIs • IRENA notes that with >60% inverter-based generation, systems without GFIs face serious stability risks 🔍 Curious how others are integrating GFIs into their systems? Let’s exchange notes — strategy, challenges, and lessons learned. #GridStability #RenewableEnergyTech #SolarAndStorage #PowerSystemsInnovation

  • View profile for Siddharth Kharvi

    Embedded Systems Engineer | Robotics, Drones, IoT | Passionate about Prototyping and Software Development | FPV Pilot

    4,160 followers

    ⚡ Brown-Out Detectors: Small circuit big protection In the world of embedded systems, power stability is critical. One small voltage drop can corrupt data or cause system failure. This is where a Brown-Out Detector (BOD) steps in as a silent guardian. 🧐 What Exactly Does a BOD Do? A Brown-Out Detector continuously monitors supply voltage. When it detects a drop below a safe threshold, it triggers a reset or protective shutdown, preventing erratic behavior. It’s like a seatbelt for your system—activated when things get risky! Why You Need One: 🔒Protects Data Integrity: Stops EEPROM/flash writes during unstable voltage. ⚙️Ensures System Reliability: Prevents unpredictable operations that could cause crashes. 📈Extends Device Lifespan: Avoids damage from low-voltage conditions, especially in battery-powered devices. 🛠️ Real-World Applications: 📶IoT Devices: Maintains consistent performance during power dips. 🚗Automotive Systems: Keeps critical electronics stable under varying loads. 🔋 Battery operated Electronics: Prevents data loss in portable gadgets during battery drain. 🚀 Takeaway: Microcontrollers such as STM 32 will have their own BoD, you can use ["FLASH_OB_BOR_LevelConfig"] Register to control built in BoD. if your system doesn't have one you can use very few components and design your own. 🔗 How do you manage power stability related issues in you projects, Let me know.!😀 #EmbeddedSystems #PowerManagement #BrownOutDetector #VoltageProtection #IoT

  • View profile for Pavel Purgat

    Innovation | Energy Transition | Electrification | Electric Energy Storage | Solar | LVDC

    27,577 followers

    🔌 Grid-forming (GFM) inverters gained significant interest because of their potential to enhance grid stability and reliability, particularly as the limitations of grid-following converters became clear. However, the GFM converter faces substantial challenges in current limiting during fault conditions. The core challenge is protecting the inverter hardware from thermal damage due to excessive output currents. The ideal current limiter must act swiftly and accurately to curtail overcurrent; however, engaging the current limiter alters the entire control architecture. This typically leads to different dynamic output behaviours that may introduce small-signal instability or excessive output voltage and current harmonics.   ⚡ Current limiting methods for GFM inverters can be categorised into direct and indirect approaches. The current limiters are highlighted in red colours in the figure. Direct current limiters aim to curtail the inverter output current by manipulating the current-reference control signals or directly controlling the semiconductor switch signals. For instance, the current-reference saturation limiter dynamically scales the current-reference signal based on the maximum allowable current, ensuring that the output current does not exceed predefined limits. The other option is the switch-level current limiting method, which directly modulates the switching signals fed to the bridge. This method achieves the fastest response as it bypasses the other control loops. However, the unavoidable consequence of bypassing the control loops is the sacrifice of power quality and even controller stability, which leads to integrator windups in the hierarchical control loops.   ⚡ Indirect current limiters, on the other hand, work by manipulating voltage-reference and power-reference signals in the inverter controls. These approaches can be slower than direct methods but avoid the windup issues associated with them. For example, voltage-based current limiting reduces the voltage reference in response to overcurrent conditions, effectively limiting the output current while maintaining control over the voltage and current phasors. This method can enhance transient stability during faults but may also lead to challenges in frequency stability and post-fault recovery. The last group of limiters that has been explored are hybrid solutions that combine the strengths of both direct and indirect methods, aiming to improve reliability and stability during current-limited operations. One of the promising approaches is combining a VI current limiter and a current-reference saturation limiter. First, the saturation limiter kicks in and limits the current to Imax. After the initial phase of fault passes, the VI current limiter takes over because the threshold current for the VI current limiter is set lower than Imax. #gridforming #microgrids #powerelectronics #battery #energystorage #gridmodernization #cleanenergy #renewables

  • View profile for Kirsch Mackey

    Revealing the hidden principles behind complex systems, technology, AI and human dynamics | Everything that’s complex is just overlapping principles.

    14,209 followers

    Signal Integrity Simplified: The One Concept That Unlocks High-Speed Design "It takes years to master high-speed PCB design." If you've heard this, you're not alone. This belief keeps countless engineers from pursuing advanced PCB design skills. But what if understanding ONE core concept could dramatically accelerate your path to high-speed design competence? The Transmission Line Revelation Early in my career, I avoided high-speed design. It seemed impossibly complex - filled with arcane formulas, specialized tools, and terminology I didn't understand. It was where the 'real' electrical engineers did 'black magic'. Then I had a breakthrough that changed everything: ALL signal integrity issues at their core relate to transmission line theory. Once I deeply understood how signals propagate along PCB traces as transmission lines, suddenly: - Impedance control made intuitive sense - Reflection problems became predictable - Cross-talk had clear solutions - EMI sources became obvious This single concept - viewing PCB traces as transmission lines rather than simple connections - unlocked an entire field that previously seemed impenetrable. From Concept to Competence in Weeks, Not Years Here's the step-by-step path I took to rapidly build signal integrity expertise: Master transmission line fundamentals (2 weeks) Learn to calculate and control impedance (1 week) Understand reflection mechanics and termination (1 week) Apply principles to real designs (4 weeks) Within just 8 weeks of focused learning, I was confidently handling 1Gbps+ designs that previously would have intimidated me. The Practical Application That Proves It Works Recently, one of my mentees (just 6 months into his hardware career) was tasked with designing a board with LPDDR4 memory - typically considered an advanced challenge. Rather than memorizing DDR4 design rules, he focused on understanding the transmission line characteristics of the signals. The result? His first DDR4 design passed simulation and validation on the first attempt - something his manager couldn't believe. When asked how long he'd been doing high-speed design, expecting to hear "years," his answer was simply: "About 6 weeks of focused study on the right things." Accelerate Your Own Mastery If you want to rapidly develop signal integrity expertise: Start with transmission line fundamentals - not just tools or checklists Use simple test boards to validate your understanding Focus on WHY rules exist, not just memorizing them Simplify complex problems by relating them back to basic principles You can develop professional-level signal integrity skills in MONTHS, not years - but only if you focus on the fundamental concepts that everything else builds upon. Question for hardware engineers: What's one "advanced" PCB design concept you've been avoiding because it seems too complex? #SignalIntegrity #PCBDesign #HighSpeedDesign #HardwareEngineering

  • View profile for Georgios Konstantinou

    Associate Professor at UNSW

    5,194 followers

    The 28 April #blackout impacting #Spain and #Portugal is yet another reminder of the complexities we face in modern #powersystems. It is still too early to pinpoint the exact cause, initial analysis (and many excellent posts here) points towards subsynchronous #oscillations across the European network leading to sequential generation disconnections (have we seen this before South Australia?), ultimately tripping the critical France-Spain interconnector and resulting in a total system loss.   Such events inevitably bring greater focus to #GridForming (GFM) converters essential in weaker systems like Australia's but increasingly relevant even in strong grids like the European due to their oscillation damping capabilities.   Yet, as promising as #GFMs are, it is crucial to acknowledge their inherent limitations. After all, they're still #powerelectronics #converters. They have their own [power] comfort zone, they are serious about their [current] boundaries and they do sometimes have commitment [#synchronisation] issues 😁 .   Our recently published work highlights some of these limitations: 1. Synchronisation challenges: GFM converters are prone to synchronisation instability when active power references cannot be reached due to limits in the converter current and the requirement for current limiters. This can lead to instabilities in GFM converters after being subjected to large frequency disturbances as the current limiter restricts the power transfer capability of GFM converters. Our work led by Tony Xu can be found here: (Composite Power-Frequency Synchronization Loop for Enhanced Frequency Response Considering Current and Power Limits of Grid-Forming Converters: https://lnkd.in/gJhNZ9DB )   2. Effective Damping of GFMs under power and current limitations: While we can design the GFM with a certain damping coefficient in its control, power limiters will reduce the available damping power during large disturbances. This might lead to frequency / power oscillations due to insufficient damping against what we originally designed. In a worst-case scenario, the damping power can drop to zero if a fully loaded GFM converter needs to respond to a frequency drop. The work led by Shan Jiang, Ye Zhu demonstrated such occasions (Bandwise Power-Synchronization Loop for Frequency Response Improvement in Grid-Forming Converters: https://lnkd.in/gUTKxnta)   Phase Jumps: In #GFL systems, a larger phase jump typically means worse conditions for the converter. However, the synchronisation modes of GFMs set different requirements, and smaller phase jumps closer to a critical angle can actually create worse conditions for a GFM converter (more on this from Shan in June 😊 )   Such incidents underscore the urgent need to rethink grid connection standards and consider mandating site-specific testing for increasingly power electronics-defined power systems. #gridintegration #renewables #stability

  • View profile for Tom Baxter

    Senior Lecturer at University of Aberdeen

    30,812 followers

    Process Safety - static electricity - fit and forget safeguards The recent fatal explosion during a chemical mixing operation in Gimpo, South Korea was attributed to the ignition of flammable vapours by static electricity. (https://lnkd.in/eAJ6EywA) The tragedy is a reminder of the importance of static electricity safeguards. Static discharge is a well-known ignition mechanism, but can be overlooked or underweighted in risk assessments, design reviews, HAZOPs, and operational assurance. Static electricity is generated by fluid flow, mixing, splashing, filtration, and phase separation: mechanisms inherent to many routine operations. Minimum ignition energies for many solvent vapours are orders of magnitude lower than the energy available from a static discharge. Static hazards are routinely controlled by bonding and earthing installed during construction. Bonding and earthing are not “fit-and-forget” safeguards. Electrical continuity across flanges can be compromised by non-conductive gaskets, corrosion, coatings, sealants, vibration, or routine maintenance. Bonding jumpers may be removed and not reinstated, or remain physically present but electrically ineffective due to poor contact or degraded earth paths. Effective control of static electricity requires more than installation standards. It requires defined inspection intervals, continuity testing, verification following maintenance or modification, and clear assignment of responsibility. Bonding and earthing should be managed as safety-critical barriers with defined performance requirements - not as passive design features. Many static-related incidents do not occur because safeguards were absent, but because they were assumed to remain effective indefinitely. In process safety terms, any control that is not periodically verified should be considered unreliable. How does your site demonstrate bonding effectiveness?

  • View profile for Maharshi Chary M.

    Electrical Design & BIM Engineer | Data Centers | Residential Buildings | BIM & Revit Specialist | Expert in AutoCAD & MEP Coordination for complex projects. Ex-Listenlights,Ex-PNCA

    4,148 followers

    📘 Engineering Notes – Part 10 ⚡ Continuing the handwritten Electrical Design Engineer notebook series with advanced electrical protection, grounding, surge protection, and distribution system verification calculations used in commercial and industrial projects. Topics Covered: ✔️ LV Busbar Short Circuit Calculation ✔️ ACB Breaking Capacity Verification ✔️ Cable Short-Circuit Withstand Check ✔️ Neutral Earthing Calculation ✔️ Lightning Protection (Air Terminal) Calculation ✔️ Surge Protection Device (SPD) Selection ✔️ Power Distribution Design Summary ✔️ Design Verification Checklist ✔️ Typical Power Distribution Single Line Diagram (SLD) ✔️ Cable Tray Fill Ratio Check This part focuses on: 🔹 Fault current analysis and equipment verification 🔹 Protective device selection and coordination 🔹 Neutral grounding and lightning protection design 🔹 Surge protection for low-voltage systems 🔹 Cable thermal withstand capability 🔹 Final design validation before project execution Useful for: 🔹 Electrical Design Engineers 🔹 BIM / MEP Engineers 🔹 Industrial & Commercial Power Engineers 🔹 Electrical Engineering Students 🔹 Interview Preparation & Practical Learning Standards Referenced: 📖 IEC 60947 (Low-Voltage Switchgear & Controlgear) 📖 IEC 60364 (Electrical Installations) 📖 IEC 62305 (Lightning Protection) 📖 IEC 61643 (Surge Protective Devices) 📖 IS 3043 (Code of Practice for Earthing) Prepared in a detailed handwritten engineering-note format to provide practical insights into electrical protection, grounding, and power distribution design used in real-world engineering projects. #ElectricalEngineering #ElectricalDesign #EngineeringNotes #ShortCircuit #ACB #SPD #Earthing #LightningProtection #PowerDistribution #SLD #CableTray #MEP #BIM #ElectricalEngineer #DesignEngineering

  • View profile for Dr. Abdelrahman Farghly

    Postdoctoral Researcher at IRC-Aerospace Engineering | Assistant Professor | Power Electronics | Microgrid | Powertrain | MBD | YouTuber with 56K+ Subscribers | Content Creator

    33,164 followers

    Today, I want to share insights about a fascinating project I’ve been working on: a bidirectional Vienna rectifier. This system is a game-changer in achieving efficient and seamless energy transfer between a battery and the grid. What is a bidirectional Vienna rectifier? A Vienna rectifier is a three-phase power converter designed for high efficiency and low harmonic distortion. When made bidirectional, it allows energy to flow in both directions—from the grid to the battery and vice versa. This capability is crucial for applications like renewable energy systems, EV chargers, and energy storage systems. Model Details Using MATLAB/Simulink, I designed a model with: Power: 20 kW Battery Voltage: 800 V Grid Voltage: 400 V RMS at 50 Hz Control Approach: A rotating synchronous frame (dq control) for current regulation and grid synchronization. The model ensures smooth bidirectional power transfer while maintaining grid stability and minimal harmonic distortion. The use of dq-based equations ensures precise control of active and reactive power, making the system robust and efficient. 💡 Why is this important? Enables efficient grid integration for renewable energy systems. Supports energy storage by charging and discharging the battery based on demand. Contributes to the sustainability goals by optimizing energy flow in smart grids. 📊 Next Steps I’m currently running advanced simulations to validate the model’s performance under varying grid conditions and load demands. Early results are promising, showing high efficiency and excellent power quality! I’d love to hear your thoughts or experiences with similar systems. Are you working on grid-tied converters, or do you have insights on further optimizing bidirectional rectifiers? Let’s discuss it! 👇 Feel free to reach out if you’d like to collaborate on similar projects. 🚀 #Engineering #RenewableEnergy #GridIntegration #MATLAB #BidirectionalRectifier #Sustainability #PowerElectronics

  • View profile for Karthikeyan R.

    Data Center & AI Infrastructure Leader | Critical Infrastructure Operations | Power, Cooling & DCIM | Energy & PUE Optimization | Data Center Transformation | 21+ Years

    5,443 followers

    UPS Factory Testing Procedures: 🔌 Ensuring Reliability Through Rigorous UPS Factory Testing! 🏭 Uninterruptible Power Supply (UPS) systems play a critical role in maintaining uptime and protecting sensitive equipment in data centers, industrial facilities and mission-critical environments. To guarantee performance and reliability, every UPS undergoes a comprehensive factory testing procedure before deployment. 1️⃣ Visual Inspection Check 🔍 Inspect the UPS for physical damage, proper labeling, and cleanliness. 2️⃣ UPS Auxiliary Device Test 🔧 Verify the functionality of auxiliary devices like communication modules and circuit breakers. 3️⃣ Alarm Verification Test 🚨 Test and confirm all alarm signals (visual and audible) under fault conditions. 4️⃣ Phase Sequence/Voltage Verification Test ⚡ Ensure correct phase sequence and voltage levels within specifications. 5️⃣ Balance Load Test ⚙️ Test UPS performance with balanced loads, checking voltage, frequency, and stability. 6️⃣ Unbalance Load Test ⚖️ Evaluate UPS handling of unequal load distribution across phases. 7️⃣ Transient/Step Load Test ⚡➡️⚡ Apply sudden load changes to verify transient response and recovery time. 8️⃣ Transfer Test (Main to Battery, Battery to Mains) 🔋↔️⚡ Simulate power failures and recoveries to check smooth transitions. 9️⃣ Transfer Test (Mains to Static Bypass, Static Bypass to Mains) 🔄 Test static bypass functionality during power disruptions or faults. ♦️ Overload Test (110% & 125%) 📈 Apply short-term overloads to test UPS performance under stress. ♦️ Short Circuit Test 🛡️ Simulate short circuits to verify protective mechanisms. Voltage Regulation Test 🔌 ♦️ Measure output voltage stability under varying load and input conditions. ♦️ AC Failure & Return Test ⚠️🔄 Simulate AC failure and restoration to evaluate performance during these events. ♦️ Harmonic Measurement 📊 Assess harmonic distortion levels for compliance with standards. ♦️ Heat Run Test (4 hours at 100%) 🌡️🔥 Run the UPS at full load for 4 hours to validate thermal stability and endurance. #UPS #Testing #Reliability #DataCenter #CriticalPower #ElectricalEngineering #QualityAssurance #PowerSystems #Sustainability #FactoryTesting

  • View profile for Dr. Majed Jabri

    Renewable energy|BESS|Green Hydrogen|

    6,636 followers

    𝐁𝐚𝐭𝐭𝐞𝐫𝐲 𝐄𝐧𝐞𝐫𝐠𝐲 𝐒𝐭𝐨𝐫𝐚𝐠𝐞 𝐒𝐲𝐬𝐭𝐞𝐦𝐬 (𝐁𝐄𝐒𝐒) 𝐆𝐫𝐢𝐝 𝐂𝐨𝐝𝐞 𝐂𝐨𝐦𝐩𝐥𝐢𝐚𝐧𝐜𝐞 𝐎𝐯𝐞𝐫𝐯𝐢𝐞𝐰 #BESS are required to comply with grid codes to ensure #safe, #reliable, and #efficient integration into the electrical network. #Compliance to grid code is critical for maintaining grid stability, particularly as the penetration of #renewable energy and #storage solutions continues to grow. While specific requirements vary by country, the following outlines the key aspects of BESS grid code compliance: 𝟏. 𝐅𝐫𝐞𝐪𝐮𝐞𝐧𝐜𝐲 𝐚𝐧𝐝 𝐕𝐨𝐥𝐭𝐚𝐠𝐞 𝐂𝐨𝐧𝐭𝐫𝐨𝐥 • #𝐏𝐫𝐢𝐦𝐚𝐫𝐲 𝐅𝐫𝐞𝐪𝐮𝐞𝐧𝐜𝐲 𝐑𝐞𝐬𝐩𝐨𝐧𝐬𝐞 (𝐅𝐅𝐑: #𝐈𝐧𝐞𝐫𝐭𝐢𝐚): BESS must respond rapidly to frequency deviations during under-frequency and over-frequency conditions. • #𝐒𝐞𝐜𝐨𝐧𝐝𝐚𝐫𝐲 𝐅𝐫𝐞𝐪𝐮𝐞𝐧𝐜𝐲 𝐑𝐞𝐬𝐩𝐨𝐧𝐬𝐞: BESS should stabilize frequency over a longer timeframe following disturbances, supporting other generating units. • #𝐕𝐨𝐥𝐭𝐚𝐠𝐞 𝐒𝐮𝐩𝐩𝐨𝐫𝐭: Maintain voltage levels at the Point of Common Coupling (PCC) by injecting or absorbing reactive power • 𝐕𝐨𝐥𝐭𝐚𝐠𝐞 #𝐑𝐞𝐠𝐮𝐥𝐚𝐭𝐢𝐨𝐧: Adjust reactive power based on grid voltage levels to support voltage stability. 𝟐. 𝐅𝐚𝐮𝐥𝐭 𝐑𝐢𝐝𝐞-𝐓𝐡𝐫𝐨𝐮𝐠𝐡 (#𝐅𝐑𝐓) 𝐂𝐚𝐩𝐚𝐛𝐢𝐥𝐢𝐭𝐲 • 𝐋𝐨𝐰 𝐕𝐨𝐥𝐭𝐚𝐠𝐞 𝐑𝐢𝐝𝐞-𝐓𝐡𝐫𝐨𝐮𝐠𝐡 (#𝐋𝐕𝐑𝐓): Remain connected during short periods of low voltage to prevent widespread disconnections. • 𝐇𝐢𝐠𝐡 𝐕𝐨𝐥𝐭𝐚𝐠𝐞 𝐑𝐢𝐝𝐞-𝐓𝐡𝐫𝐨𝐮𝐠𝐡 (#𝐇𝐕𝐑𝐓): Withstand short periods of high voltage without tripping. • 𝐆𝐫𝐢𝐝 #𝐒𝐭𝐚𝐛𝐢𝐥𝐢𝐭𝐲: Maintain operation during disturbances such as faults or sudden generation loss. 𝟑. 𝐀𝐜𝐭𝐢𝐯𝐞 𝐚𝐧𝐝 𝐑𝐞𝐚𝐜𝐭𝐢𝐯𝐞 𝐏𝐨𝐰𝐞𝐫 𝐂𝐨𝐧𝐭𝐫𝐨𝐥 • #𝐀𝐜𝐭𝐢𝐯𝐞 𝐏𝐨𝐰𝐞𝐫: Ability to inject or absorb active power on demand for applications such as peak shaving and energy arbitrage. • #𝐑𝐞𝐚𝐜𝐭𝐢𝐯𝐞 𝐏𝐨𝐰𝐞𝐫: Provide reactive power support to enhance voltage stability. 𝟒. 𝐏𝐨𝐰𝐞𝐫 𝐐𝐮𝐚𝐥𝐢𝐭𝐲 • #𝐇𝐚𝐫𝐦𝐨𝐧𝐢𝐜 𝐃𝐢𝐬𝐭𝐨𝐫𝐭𝐢𝐨𝐧: Comply with Total Harmonic Distortion (#THD) limits to prevent grid instability. • #𝐕𝐨𝐥𝐭𝐚𝐠𝐞 𝐅𝐥𝐢𝐜𝐤𝐞𝐫: Avoid causing voltage flicker or fluctuations that impact grid users 𝟓. 𝐎𝐩𝐞𝐫𝐚𝐭𝐢𝐨𝐧𝐚𝐥 𝐋𝐢𝐦𝐢𝐭𝐬 𝐚𝐧𝐝 𝐆𝐫𝐢𝐝 𝐏𝐫𝐨𝐭𝐞𝐜𝐭𝐢𝐨𝐧 • Operate within specified voltage and frequency ranges without #tripping. • Coordinate with grid protection systems to avoid interference during #faults. • Comply with limits on short-circuit current contribution for proper #protection coordination. 𝟔. 𝐑𝐞𝐬𝐩𝐨𝐧𝐬𝐞 𝐓𝐢𝐦𝐞 𝐚𝐧𝐝 #𝐑𝐚𝐦𝐩 𝐑𝐚𝐭𝐞𝐬 • Respond quickly to #frequency or #voltage deviations as per grid code requirements. • Adhere to defined ramp rate limits for #charging and #discharging to prevent #instability. 𝟕. 𝐒𝐭𝐚𝐭𝐞 𝐨𝐟 𝐂𝐡𝐚𝐫𝐠𝐞 (#𝐒𝐎𝐂) 𝐌𝐚𝐧𝐚𝐠𝐞𝐦𝐞𝐧𝐭 • Maintain SOC levels to ensure sufficient #capacity for grid events. • Implement #automatic #reserve requirements as specified by grid codes.

Explore categories